Thursday, 19 November 2026

Subscribe Now

Traffic jams at Mhasawad chowk as flyover work stalls for ten years in Jalgaon taluka

Daylight village intersection, roadside shops, trees, utility poles and a broad concrete road Images are not validated/verified
Civic PT24 team

Cement concrete road work and encroachments are choking Mhasawad's main junction, and ST bus services to the rural area have been disrupted during Diwali.

Cement concrete work is under way on the Mhasawad-Bornar road in Mhasawad, Jalgaon taluka, creating a major traffic problem. The flyover work has been stalled for the past ten years, so heavy vehicles are passing through the village itself.

As a result, the main chowk at Mhasawad sees heavy jams every day. Drivers, passengers and local residents are facing considerable hardship. Encroachments around the chowk are growing by the day, making the problem worse.

With encroachments on the road and the way narrowed, heavy vehicles as well as State Transport (ST) buses find it difficult to pass. This is directly affecting public transport. It is reported that buses of the Erandol depot have been brought to a near standstill because of the encroachments and obstruction by some people.

Passenger crowds are heavy during the Diwali festival days. With ST bus services disrupted at this very time, villagers, students, women and the elderly are especially affected.

At present, only one bus, the Jalgaon-Kurangi service, runs to and from the rural area. Passengers therefore have to depend on other means of transport.

Mhasawad is a large and important village in the surrounding Panchkroshi area. It has an agricultural produce market committee, the Mhasawad police station under the MIDC, and a primary health centre. Branches of the State Bank of India, Maharashtra Gramin Bank and the Jalgaon District Central Cooperative Bank are also located here. People from many surrounding villages come and go every day. Despite this, they have to endure the jams, encroachments and problems with ST bus services.

Residents demand that the stalled flyover work be taken forward and the cement concrete road work be completed in a planned manner. They also want the encroachments at the chowk removed and proper traffic arrangements made. The Erandol depot and the transport department concerned have also been asked to resolve the issue of cancelled or disrupted bus trips and restore ST services in the rural area to what they were earlier.

It is a matter of concern that basic traffic facilities remain a question in an important village like Mhasawad. Hope has been expressed that the administration, elected representatives and local residents will together give serious attention to the problem and take concrete steps soon.

#Nagpur#Civic#PT24#शहर#नागपुर

Choose primetime24.com as a preferred source on Google Google shows more stories from your preferred sources in Top Stories.

Advertisement