Tuesday, 17 November 2026

Subscribe Now

MSEDCL Abhay scheme waives interest, late fees for 2.41 lakh defaulters in Akola circle

Inside an electricity office, a customer submits papers while others wait nearby Images are not validated/verified
Civic PT24 team

Customers in Akola, Buldhana and Washim whose power connections were cut can clear dues under the scheme running from November 6, 2026 to January 15, 2027.

Mahavitaran has announced the "Abhay Yojana 2026-27" for high-tension and low-tension consumers whose electricity connections have been disconnected, permanently or temporarily. In Akola circle, 2,41,092 defaulting consumers can benefit. Mahavitaran Chief Engineer Dattatraya Bansode said this was a chance to be free of arrears and eligible consumers should take advantage of it.

The scheme will run from November 6, 2026 to January 15, 2027. Domestic, commercial, industrial and other non-agricultural consumers whose connections were permanently disconnected by March 31 are eligible. Consumers whose connections were temporarily disconnected by December 31, 2025 are also eligible. Agricultural pump consumers and public tap water supply schemes are excluded.

Under the scheme, 100 per cent of the interest and late fee levied on the arrears will be waived. Those who pay the remaining principal arrears in one go will get an additional rebate of up to 20 per cent. Low-tension consumers can pay 50 per cent of the amount upfront and the rest in six equal interest-free monthly instalments. High-tension consumers have the option of three to six instalments. Consumers with a sanctioned load of up to 20 kW who choose a prepaid smart meter when getting the connection restored will get an additional 5 per cent rebate.

Eligible consumers in Akola circle owe Rs 241.07 crore in principal arrears, on which interest is Rs 40.55 crore and late fee Rs 2.95 crore.

In Akola district, 69,419 consumers owe Rs 75.40 crore in principal arrears. Interest of Rs 12.29 crore and late fee of Rs 93 lakh will be waived for them.

In Buldhana district, 1,10,366 consumers owe Rs 107.26 crore. Interest of Rs 19.95 crore and late fee of Rs 1.28 crore will be waived. In Washim district, 61,307 consumers owe Rs 58.41 crore. Interest of Rs 8.29 crore and late fee of Rs 72.52 lakh will be waived.

To join the scheme, consumers must apply through Mahavitaran's official online portal or mobile app. Mahavitaran has appealed to eligible defaulting consumers to apply within the stipulated period, take advantage of the waiver of interest and late fee, and settle their arrears.

#Nagpur#Civic#PT24#शहर#नागपुर

Choose primetime24.com as a preferred source on Google Google shows more stories from your preferred sources in Top Stories.

Advertisement