Thursday, 19 November 2026

Subscribe Now

First train for Mumbai Metro Line 5 reaches Kasheli depot

Workers inspect a metro train and tracks at an unfinished depot in daylight Images are not validated/verified
Civic PT24 City Desk

The first train of Mumbai Metro Line 5 has arrived at the Kasheli depot of the Mumbai Metropolitan Region Development Authority (MMRDA). It is being seen as an important milestone in preparations for Line 5.

Trains of the Thane-Bhiwandi-Kalyan corridor will be stabled at this depot, where they will also be inspected, tested and maintained. Work on the depot is still on, but the platform for unloading and loading coaches and a temporary inspection bay are ready. With these facilities, trains can be kept here and initial checks can be carried out.

The depot spreads over 27 hectares and is designed to hold about 30 trainsets. It will have five inspection lines, four workshop lines, a separate test track and a train-washing facility. These facilities will keep Line 5 trains ready for daily passenger service.

#Mumbai#Civic#PT24#शहर#मुंबई

Choose primetime24.com as a preferred source on Google Google shows more stories from your preferred sources in Top Stories.

Advertisement