Wednesday, 18 November 2026

Subscribe Now

Villagers try to block Sehore-Shyampur road over potholes and unannounced power cuts

Villagers stand on a damaged rural road, with a motorcycle, fields and a broken culvert nearby Images are not validated/verified
Civic PT24 City Desk

Villagers near Chandbadh tried to stage a road blockade on Monday, and called it off for now after officials promised to resolve the problems within a week.

Villagers angered by the dilapidated state of the Sehore-Shyampur road and by unannounced power cuts tried to block the road near Chandbadh on Monday afternoon. A large number of villagers came out on the road in protest.

Officials reached the spot and assured the villagers that the problems would be resolved within a week. The villagers then put off their agitation for the time being.

The villagers, who had gathered under the leadership of former district panchayat member Rajesh Gaur, said power cuts of four to five hours a day were hitting Chandbadh and about 30 surrounding villages. There is no fixed time for the outages, leaving farmers and ordinary residents badly affected.

The road, the main link between dozens of villages, including Shyampur tehsil, and the district headquarters at Sehore, has fallen into complete disrepair. The bitumen has come off, there are large potholes in many places, and loose stone chips lie scattered. Farmers, students, patients and two-wheeler riders who travel the road daily face the risk of accidents.

The Sehore-Shyampur road is 24.30 km long. It was sanctioned on June 28, 2022, and was built by the Madhya Pradesh Road Development Corporation (MPRDC) at a cost of about Rs 29.03 crore. It was described as the first road in Madhya Pradesh built with the full depth reclamation (FDR) technique.

In this technique, the old road is torn up by machine, and the road is then laid again using the same material mixed with chemicals and a binder. At the time of construction, it was claimed that this would cut costs by 40 to 50 per cent. It was also said that the road would be twice as strong and durable as ordinary roads.

However, in the first rain in June 2023, the road began to come apart and developed cracks. A culvert was also damaged. The villagers had to take to the road after their long-standing demand for repairs went unheeded.

#Indore#Civic#PT24#शहर#इंदौर

Choose primetime24.com as a preferred source on Google Google shows more stories from your preferred sources in Top Stories.

Advertisement