Two workers hurt as lift fails at medical college building under construction in Ujjain
Images are not validated/verified
Two workers were injured after a lift failed and tilted at a medical college building being built near Charak Hospital in Ujjain on Sunday.
Painting work was under way on Sunday at the medical college building under construction near Charak Hospital in Ujjain when a lift suddenly failed and tilted to one side.
Two workers were on the lift. They fell from a height of about 9 to 10 feet and were injured. Som Prajapati and Rohit were hurt. Neeraj, who was working with them, suffered minor injuries.
Both injured men have been admitted to Charak Hospital for treatment. Their condition is reported to be out of danger for now, and treatment is continuing at the hospital.
Neeraj, who was at the spot, said they were doing colour and painting work in the medical college building. Material was being prepared for the work when the lift suddenly failed. It tilted to one side and the workers on it fell.
According to Neeraj, Som was hurt when a steel rod struck him, while Rohit's leg was crushed and sprained. Neeraj was also there but was only slightly hurt because he was on the ground.
After the accident, a security guard at the construction site closed the gate and stopped people from moving in and out. The contractor's side is not willing to say anything on the matter.
Reach readers on the ward they actually live in.
Advertise with Prime Time 24Reach readers on the ward they actually live in.
Advertise with Prime Time 24Reach readers on the ward they actually live in.
Advertise with Prime Time 24Choose primetime24.com as a preferred source on Google Google shows more stories from your preferred sources in Top Stories.
Reach readers on the ward they actually live in.
Advertise with Prime Time 24
Comments
No comments yet. Be the first.